Please apply for your Demolition permit using the information below.
Ensure you have all of the following items as applicable to submit for a demolition permit.
*** Pre-Demo Inspection is to be completed BEFORE permit is issued. ***
Utilities disconnected, capped off and left exposed for inspection
______ Electric
______ Gas
______ Plumbing
______ Water & Wastewater, etc.)
_______ Temporary fencing installation date
_______ Attach an aerial photo of site and label all structures that are to be demolished.
_______ A Final inspection is required after demolition and removal of all debris.
_______ Asbestos survey completed. (if applicable)
_______ Permit Fees paid
You will upload all of the above documents after completing the registration on the permit portal as described to the right.
DOWNLOAD THE PERMIT APPLICATION (HERE)
A Pre-inspection must be completed BEFORE issuance of permit to confirm:
• All utilities (electrical, plumbing, gas, water, wastewater, etc.) MUST be disconnected, capped off and left exposed to be inspected by the City BEFORE the demolition may begin.
• Temporary fencing MUST be in place during the demolition of the project to ensure safety.
A final inspection is required after demolition and removal of all debris.
Commercial/Public Buildings Senate Bill 509 requires municipalities to verify that an asbestos survey has been conducted prior to issuing permits for public or commercial buildings.
Using the portal button below, please follow the steps below for accessory structure permit.
Click Residential or Commercial
--> Next Step
Click Renovation --> Next Step
--> Next Step ---> Create Project
* Fees will be added once a permit is received if they are not automatically calculated and will need to be paid before plans are sent to plan review.
At this time, you need to submit the required documents
Click Review Project
Click First Review
Click Upload Documents for Review.
Upload all documents listed in the required documents listed to the left.